WSEGPULL
Recognised by the OPM Flow parserSCHEDULE
This keyword, WSEGPULL, specifies a multi-segment well segment to be a pull-through pump for a down-hole water separator, defined by the WSEGSEP keyword in the SCHEDULE section, and defines the various parameters for this type of pump. Down-hole separators are used to separate water or free gas from the in situ fluid entering the wellbore in order to increase hydrocarbon recovery.
This keyword is not supported by OPM Flow but would change the results if supported so the simulation will be stopped.
- Records
- One or more records, each terminated by
/ - Items per record
- 7
Parameters
| No. | Name | Description | Type | Dimension | Default |
|---|---|---|---|---|---|
| 1 | WELL | STRING | |||
| 2 | SEGMENT1 | INT | |||
| 3 | SEGMENT2 | INT | |||
| 4 | P | DOUBLE | |||
| 5 | DP | DOUBLE | Pressure | ||
| 6 | OIL_ | DOUBLE | Volume/ | 0 | |
| 7 | GRADIENT_ | DOUBLE | Pressure* | 0 |
Manual source: parts/chapters/subsections/12.3/WSEGPULL.fodt