WTADD

Recognised by the OPM Flow parserSCHEDULE

This keyword, WTADD, adds a constant to a previously define well’s target or constraint, as stated on the WCONPROD, WCONINJE, or WELTARG keywords, but not for the history matching wells using the WCONHIST or WCONINJH keywords. All the aforementioned keywords are in the SCHEDULE section. The constant can be positive or negative.

This keyword is not supported by OPM Flow but would change the results if supported so the simulation will be stopped.

Records
One or more records, each terminated by /
Items per record
4

Parameters

No.NameDescriptionTypeDefault
1WELLSTRING
2CONTROLThe control mode seems to be a UDA??STRING
3SHIFTUDA
4NUMINT1

Manual source: parts/chapters/subsections/12.3/WTADD.fodt