WSEGFLIM

Recognised by the OPM Flow parserSCHEDULE

WSEGFLIM enables an artificial choke that chokes a given phase flow rate for a segment in a multi-segment well. This can be used, for example, to constraint unwanted production phase through a section of tubing, or to model a down-hole choke. The keyword provides coefficients that are applied to the frictional pressure drop across a multi-segment well’s segment in order to inhibit production from that particular zone or segment. As such, the keyword does not actually model a down-hole choke; hence, the term artificial.

This keyword is not supported by OPM Flow but would change the results if supported so the simulation will be stopped.

Records
One or more records, each terminated by /
Items per record
10

Parameters

No.NameDescriptionTypeDimensionDefault
1WELLSTRING
2SEGMENT1INT
3SEGMENT2INT
4LIMITED_PHASE1STRINGNONE
5FLOW_LIMIT1DOUBLELiquidSurfaceVolume/Time
6A1DOUBLE
7LIMITED_PHASE2STRINGNONE
8FLOW_LIMIT2DOUBLELiquidSurfaceVolume/Time
9A2DOUBLE
10STATUSSTRINGOPEN

Manual source: parts/chapters/subsections/12.3/WSEGFLIM.fodt