WDRILPRI

Recognised by the OPM Flow parserSCHEDULE

This keyword, WDRILPRI, adds wells to the Drilling Priority Drilling Queue and defines the well priority and drilling unit number or batch queue sequence for the well. The batch queue sequence number enables all wells with the same sequence number to drilled at the same time.

This keyword is not supported by OPM Flow but would change the results if supported so the simulation will be stopped.

Records
One or more records, each terminated by /
Items per record
3

Parameters

No.NameDescriptionTypeDefault
1WELLSTRING
2PRIORITYDOUBLE-1
3DRILLING_UNITINT0

Manual source: parts/chapters/subsections/12.3/WDRILPRI.fodt