SCHEDULE
SCHEDULE
The SCHEDULE activation keyword marks the end of the SUMMARY section and the start of the SCHEDULE section that defines the group and well definitions, operating and economic constraints, as well as how OPM Flow should advance through time. Numerical controls are also defined in this section and all parameters can be varied through time.
There is no data required for this keyword.
- Records
- No records — the keyword stands alone
Example
-- ==============================================================================
--
-- SCHEDULE SECTION
--
-- ==============================================================================
SCHEDULE
The above example marks the end of the SUMMARY section and the start of the SCHEDULE section in the OPM Flow data input file.Manual source: parts/chapters/subsections/12.3/SCHEDULE.fodt