COMPINJK

Recognised by the OPM Flow parserSCHEDULE

The COMPINJK keyword assigns injection well relative permeability values to well connections.

This keyword is not supported by OPM Flow but would change the results if supported so the simulation will be stopped.

Records
One or more records, each terminated by /
Items per record
6

Parameters

No.NameDescriptionTypeDimensionDefault
1WELLSTRING
2IINT0
3JINT0
4K_UPPERINT0
5K_LOWERINT0
6REL_PERMDOUBLE10

Manual source: parts/chapters/subsections/12.3/COMPINJK.fodt